terça-feira, 27 de outubro de 2020

Watch out! Your Construction business might be under a cyber attack

Lately, risk experts have talked more about cyber risks. One important thing that I've recently heard from one of these experts is that cyber risk is not an IT department matter only, but it should be a strategic concern. What about cyber risks in the Construction industry?

The Construction Industry has experienced an increase in the use of digital tools during the last years. The COVID-19 pandemic has also pushed their adoption and virtual collaboration with people working from their homes. The 2019 Aon Global Risk Management Survey Report shows that the completion of cyber risk assessment in the Construction industry raised from 36% in 2017 to 43% in 2019. It has a lot of room for improvement, and the increase in digitalization and virtual work increases the exposure to cyber risks. So, how prepared is your organization to avoid, mitigate, and respond to cyber-attacks? Can you imagine the BIM model of a strategic project being hacked? Are people in your organization aware of the potential of cyber attacks? I have personal experience with it. Around two years ago, I received an e-mail from the VP of a construction company in the U.S. The message had a sort of a professional invitation, but at the same time, the structure and language of the message sounded weird. I decided to check with the sender, and he/she answered me that he/she was hacked! He/she was the VP of a construction company, so you probably can imagine how many people got the same message and maybe clicked on the phishing message spreading the issue.

Yes, cyber attacks are escalating. We need to be aware of it and include them in our risk management strategies.

What do you think about cyber risks in the Construction industry? Share your thoughts, experience, and opinions. Please, keep the organization's name private.

Links:


#cyberrisk #cyberattack #constructionindustry #risk #riskmanagement #construction

sexta-feira, 9 de outubro de 2020

Rethinking Supply Chains in a Post-Pandemic World

Rethinking Supply Chains in a Post-Pandemic World [Construction Executive]



Do you assess the third-party risk in your supply chain? The third-party risk has gained increased attention lately, and because of the COVID-19 pandemic, many industries are rethinking their supply chains, including the construction industry. A construction project usually involves many suppliers, and some of them are critical to the project. For example, think about the suppliers of the long-lead items and the specialty trader contractors. Therefore, construction companies need to plan and evaluate the potential third-party risks during and post-COVID through a third-party risk assessment to protect the projects as much as possible.

Do a quick web search by "supply chain risk and third-party risk" and "third-party risk assessment," and you will get some material to read.

Quoting from the article:
"Post COVID-19, the most crucial supply chain risk management strategies include an in-depth assessment of every part of the supply chain using a risk-based supplier evaluation process."
"The right technology and real-time data can provide insights to mitigate potential supply chain risk in the future..."

#riskmanagement #thirdpartyrisk #supplychainrisk #thirdpartyriskassessment

quarta-feira, 7 de outubro de 2020

New technology in construction and the associated risks - unmanned aerial systems (UAS or drones)

Make Certain Drone Policies Also Manage Risk: Conformity with FAA regulations is just the start to a robust and legally compliant drone program. Contractors also need a risk management program that addresses prevention and mitigation.

I'm a big fan of new technology in construction, and it is a topic that attracts my attention and curiosity. At the same time, we need to understand the risks (threats and opportunities) that new technology can bring to our projects. We need to investigate the risk impact of new technology on project performance and prepare the organization to manage these risks. This article reflects this idea, in this case, with the use of unmanned aerial systems (UAS or drones) in construction. Although this article mentions the U.S. regulations, construction firms in other countries need to be aware of the local regulations about UAS usage.

From the article, "Construction executives must deploy a tailored and full risk management program covering its UAS usage. Such a program should comport with all applicable federal, state and local laws and regulations, be consistent with the owner's UAS policy, be an evolving policy which requires proper training of the UAS team and reflect the rapidly changing regulatory framework and operational guidelines."

#riskmanagement #newtechnology #drones

terça-feira, 6 de outubro de 2020

Bê á Bá Gerenciamento de Riscos com Claudia Garrido

Building Strong Risk Committee Relationships [Risk Management Magazine by Neil Hodge]

Building Strong Risk Committee Relationships


http://www.rmmagazine.com/2020/10/01/building-strong-risk-committee-relationships/

This article can give us useful insights on how to leverage the risk management practice inside an organization. Risk managers need to collaborate with the board and the departments, and they need to align risk management with the organization's goals and strategy. They also need to develop a positive outlook and do their homework to support their ideas. #riskmanagement

The construction environment during the COVID-19 pandemic - two sides of the same coin

The construction environment during the COVID-19 pandemic - two sides of the same coin

Originally published on Jun 29, 2020, on https://sites.google.com/view/claudiagarrido/home

https://www.linkedin.com/pulse/construction-environment-during-covid-19-pandemic-two-garrido/


(Jun 29, 2020) During the COVID-19 pandemic, the construction environment has experienced two opposite approaches. At one extreme, accelerated projects to repurpose buildings into hospitals, or building new ones to respond to the urgent need of treatment units. On the other extreme, current projects or new construction projects will need to be completely replanned, making the duration longer.

The COVID-19 pandemic brought the need to have more hospital beds to patients' treatment. Cities have responded in some ways to fulfill this need, such as repurposing existing facilities, erecting temporary medical facilities, or building new ones in accelerated ways. The repurposing of existing facilities included, for example, the transformation of convention centers and hotels. Examples of convention centers transformed into care units have happened in New York City, Chicago, Miami Beach, and Washington, DC. Hotels have also been converted into healthcare facilities. These transformations and conversions are occurring fast. For instance, a hotel conversion in St. Louis (M.O., USA) took less than 100 hours.

The erection of temporary medical facilities and the construction of new ones in accelerated ways have also taken place. In Paramus (N.J., USA), a temporary medical facility was built in two weeks to support the main hospital building. Cities in Brazil have also adopted the alternative to building temporary medical facilities or "campaign hospitals" through public or private ventures. Last, new medical facilities have occurred using modular or prefab construction. The first ones seen were the two hospitals in the Chinese city of Wuhan. A modular medical facility was erected in Brazil, expanding to the M'boi Mirim hospital in Sao Paulo. A total of 44 modules were built offsite and assembled in 11 days. Large contractors in the U.S. are now also offering prefab modular systems for health screenings.

However, while the COVID-19 pandemic has driven the acceleration of some construction projects, it also causes the need to replan others. Construction projects underway need now to consider other health and safety precautions, including social distancing, meaning that activities must be replanned to avoid people working on top of each other, and sanitation routines. Low degrees of activity overlapping, or no overlapping, and different shifts may be adopted. Technology has also helped to mitigate some of the issues, such as the performance of remote inspections by video. In the end, while some contractors are trying to recover the delay caused by the pandemic, many projects will be delayed.

While construction is experiencing opposite approaches during this pandemic period, there is no doubt that lessons have been learned. For example, some contractors may now embrace modular or prefab construction. Remote inspections might come to stay, and remote collaborating work might now not be so threatening to many. The pandemic disruption may also be an opportunity to reflect on current practices and a moment for a change
.

domingo, 23 de junho de 2013

Comentários sobre o Webminar "Building a Drill Rig while Applying Quality Assurance Principles"


A ideia deste texto é deixar alguns comentários sobre o webminar "Building a Drill Rig while Applying Quality Assurance Principles". O webminar foi apresentado pelo Donald Kerr e organizado pela Comunidade de Prática de Energia, Óleo, Gás e Petroquímica (EOG&P CoP) [1], do PMI. Assim como em textos anteriores, irei organizar os comentários em gerais, positivos e a melhorar.

Desta forma, o assunto da apresentação foi sobre a aplicação de princípios de garantia da qualidade na construção do casco de uma plataforma de perfuração marítima, do tipo semi-submersível. Para quem não conhece, uma plataforma de perfuração marítima é uma unidade que, posicionada, é responsável por perfurar as camadas no fundo do mar para a construção dos poços de petróleo, para posterior extração e produção por outro tipo de plataforma. Assim, o foco foi de assegurar a qualidade do produto (plataforma de perfuração) e não do sistema de gestão (ex. ISO 9001, ISO 14000, etc.). A estrutura da apresentação não foi claramente mostrada pelo autor, mas de forma geral foi organizada mostrando a imagem do que seria a plataforma de perfuração, as características técnicas da unidade, a definição de Sociedade Classificadora, a definição de garantia da qualidade e o plano de ação da garantia da qualidade. A partir deste último ponto, o autor percorre a apresentação abordando os itens de A a F enumerados no plano de ação.  

Assim, destaco como pontos positivos da apresentação os itens abaixo.

# Redução do risco
A ideia de redução do risco através da revisão da documentação e dos certificados, incluindo a redução do risco no contrato, apontando algumas disciplinas de construção críticas e alguns meios possíveis para redução do risco. Isto vai ao encontro da atuação na prevenção, ao invés da correção, nas fases prévias de construção, o que minimiza impactos no custo e no prazo.

# Atuação na aceitação dos equipamentos
Outro ponto interessante é a sequência (fluxograma) de aceitação dos equipamentos, o que inclui os testes de fábrica (chamados de FAT - factory acceptance tests no mercado). Esta sequência não deverá ser novidade para as pessoas que já possuem experiência na área, mas ajudam as que possuem menos conhecimento e, obviamente, esta sequência pode variar ligeiramente de empresa para empresa. 

# Atuação durante o processo de seleção de uma contratada/subcontratada
Adicionalmente, destaco também a ideia de aplicação da garantia da qualidade durante o processo de seleção de uma contratada/subcontratada, onde foi encontrada uma importante ação corretiva, que caso contrário poderia comprometer a estrutura da unidade de perfuração. A ideia também foi apresentada em forma de fluxograma, facilitando a compreensão.

# Inspeção e testes
A apresentação, em forma de um fluxograma, de exemplo para realizar o plano de inspeção e testes, com certeza auxilia e organiza o trabalho, mas requer experiência e conhecimento para cria-lo.

# Progresso da produção
O diagrama em alto nível do progresso da produção é um exemplo do que foi utilizado no projeto abordado pelo apresentador, que deve ser adaptado a cada projeto, mas assim como o fluxograma apresentado para o FAT é uma ferramenta que ajuda a compreensão dos menos experientes no assunto.

# Checklist exemplo de um processo de controle
O autor apresenta um formulário com o exemplo de uma checklist (lista de verificação) para aplicação como processo de controle. Aqui cabe a observação de que, para o autor, o processo de controle está incluído no processo de garantia da qualidade. Ressalto este ponto porque para os que seguem as práticas da área de qualidade do PMBOK estes dois processos são distintos, onde um não está contido no outro. O interessante da aplicação de uma lista de verificação é que ela funciona como um guia para o aplicador, permitindo não deixar de fora da verificação itens importantes. Por sua vez, também é uma ferramenta interessante para os profissionais com menos experiência. Há empresas que costumam automatizar este processo de registro e acompanhamento das listas de verificação. Um outro ponto comentado pelo autor, é a parte do formulário em que o aplicador faz recomendações, o que ele destaca como onde o aplicador toma decisões.

# Progresso da auditoria
Aqui é mais um ponto onde o autor apresenta um fluxograma, de sequência do progresso da auditoria. O autor pontua também que um auditor de uma certificadora externa auditou este programa de auditoria para ensaios não destrutivos e elogiou o processo.

# Conclusões
São apresentadas uma série de conclusões, dezesseis no total, da aplicação dos princípios da garantia da qualidade neste projeto específico, mas gostaria de destacar os itens da conclusão que: (1) aponta os "hold points" como forma de demonstração da aceitação do produto e; (2) a montagem dos equipamentos em bases pré-fabricadas.

Em contrapartida, também gostaria de listar alguns pontos que poderiam melhorar, tais como a estruturação da apresentação e a forma como o conteúdo foi apresentado.

Desta forma, sobre a estrutura da apresentação, o autor não apresentou sumário ou agenda, assim, achei que a apresentação se desenrola de forma confusa, onde você não sabe exatamente onde está e qual a sequência. Não há quebras ou subtítulos. A inserção de uma agenda e de subtítulos ajudaria a acompanhar melhor o desenvolvimento do assunto.

Por sua vez, alguns slides são densos de informação, de texto principalmente, com um leiaute que não ajuda muito, sem espaçamento entre as linhas, o que torna a leitura difícil durante a apresentação.

Por fim, achei que o conteúdo foi preparado para pessoas que já conhecem alguma coisa do processo de construção, caso contrário terão dificuldade de entender e acompanhar a apresentação.

Concluindo, o objetivo da apresentação, de mostrar a aplicação dos princípios da garantia da qualidade em uma construção é interessante, já que talvez seja mais comum as pessoas conhecerem a aplicação destes princípios nas indústrias que fabricam produtos em série. Assim, algumas ferramentas e fluxogramas, que foram aplicados durante a obra em questão, são apresentados e que ajudam a quem está assistindo a compreender melhor o assunto. Mas por sua vez, existem pontos importantes que poderiam fazer com que a apresentação fosse melhor compreendida, tais como a estruturação ou agenda da apresentação e o próprio leiaute do conteúdo nos slides.

[1] Tradução livre da autora